Name of Owner :- MR.
| |||||
Type of structure :-POLTERY SHED
| |||||
LOCATION :- S.NO.
| |||||
ABSTRACT SHEET
| |||||
NO.
|
DESCRIPTION
|
QTY.
|
RATE
|
PER
|
AMOUNT
|
1
|
SITE CLERANCE :-
| ||||
Removing grass, boulder etc. from propose
|
L/S
|
500
| |||
d site & other material if neccesary as per
| |||||
Engg. in-charge direction.
| |||||
2
|
EXCAVATION :-
| ||||
Excavation for foundation in earth soil of all
| |||||
types sand,gravel & soft murum including
| |||||
removing the excavated material up to dist
| |||||
of 50m beyond the building area &spread
| |||||
ing as per direct.dewatering prepare the bed
| |||||
for the foundation & neceesary back filling
| |||||
ramming,watering including shoring & shulte
|
156.89
|
86
|
Cu.m.
|
13492.54
| |
ring etc. completed as per direction.
| |||||
3
|
P.C.C. :-
| ||||
Providing & laying in situ cement concret
| |||||
1: 4: 8 of trap / granite / quatzite / gneiss met
| |||||
al for foundation & bedding including bailing
| |||||
out water manually form work,compacting ,
| |||||
covering newly laid on concrete by gunny bag
|
7.45
|
2800
|
Cu.m.
|
20860
| |
plastic or trapaulin curing etc. completed.
| |||||
4
|
R.C.C. FOOTING :-
| ||||
Providing & laying in situ cement concret of
| |||||
M20 grade of trap / granite / quatzite / gneis
| |||||
s metal for R.C.C. work & footing of R.C.C.
| |||||
column including baling out water manually
| |||||
form work compacting covering newlly
| |||||
laid concrete by gunny bag,plastic,curing
| |||||
& roughing the surface if special finish is to
| |||||
be provided.( Excluding reinforcement &--
| |||||
structural steel ) the cement mortor 1:3 plaster
| |||||
considered for rendering un even surface only.
|
11.9
|
4500
|
Cu.m.
|
53550
| |
88402.54
| |||||
ABSTRACT SHEET
| |||||
NO.
|
DESCRIPTION
|
QTY.
|
RATE
|
PER
|
AMOUNT
|
5
|
R.C.C. COLUMN :-
| ||||
Providing & laying in situ cement concret of
| |||||
M20 grade of trap / granite / quatzite / ge.
| |||||
metal for R.C.C. column as per detailed
| |||||
design & drawing or as directed inclu.
| |||||
centring,form work of plywood / steel
| |||||
compaction,covering newly laid concrete
| |||||
by gunny bag,plastic or tarpulin,finishing
| |||||
the formed surface with cement mortar
| |||||
1:3 of sufficent minium thickness to
| |||||
give a smooth and even surface or roug
| |||||
hening if special finish is to be provided
| |||||
& curing etc. completed.( excluding--
| |||||
reinforcement ) The cement mortar 1 : 3
| |||||
plaster is considered for rendering un-
|
8.89
|
4500
|
Cu.m.
|
40005
| |
even & honey combed surface.
| |||||
6
|
R.C.C. BEAMS & LINTEL :-
| ||||
Providing & laying in situ cement concret
| |||||
of M20 grade of trap / granite / quatzite
| |||||
/ gneiss metal for R.C.C.beams & lintel
| |||||
as per detailed drawing & designs or as
| |||||
directed including centering form work
| |||||
of plywood / steel,compaction,covering
| |||||
newly laid concrete by gunny bag,plastic
| |||||
or tarpuli,finishig the formed surface
| |||||
with cement mortar1:3 of sufficent min.
| |||||
thickness togive a smooth and even
| |||||
surface or roughening if special finish is
| |||||
to be provided & curing etc. completed.
| |||||
( Excluding reinforcement ) The cement
| |||||
mortar 1 : 3 plaster is considered for
|
12.1
|
4500
|
Cu.m.
|
54450
| |
rendering uneven & honey comb surface.
| |||||
8
|
STRUSS-
| ||||
Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position, making riveted / bolted / welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting of approved quality and shade complete. Spec. No. : Bd.C.8 Page No. 278
|
1.75
|
#######
|
M.T.
|
119887.25
| |
ABSTRACT SHEET
| |||||
NO.
|
DESCRIPTION
|
QTY.
|
RATE
|
PER
|
AMOUNT
|
8
|
G.I.SHEET :-
| ||||
Providing and fixing corrugated galvanised iron sheets of 0.80mm thickness (22 B.W.G.) for roofing with wind ties including fastening with galvanised iron screw and bolts and lead and bitumen washers as per drawing complete. Spec. No. : Bd.R.5 Page No. 452
|
150
|
350
|
SQ.M.
|
52500
| |
RIDGE-
| |||||
9
|
Providing and fixing G.I. sheets of 22 B.W.G. (0.8 mm) over the ridge, hip or valley for galvanised corrugated iron sheet roofing including fastening with galvanised iron screws and bolts and lead and bitumen washers, including filling gaps by C.M. 1:3 etc. complete. Spec. No.: Bd.R. 6 / Page No. 452
|
75
|
114
|
R.M.
|
8550
|
9
|
R.C.C.SLAB:-
| ||||
Providing & casting in situ cement concret
| |||||
of M20 grade of trap / granite / quatzite/
| |||||
gneiss metal for R.C.C.Pardi up 150mm
| |||||
as per detailed drawing & designs or as
| |||||
directed including centering form work
| |||||
of plywood / steel,compaction,covering
| |||||
newly laid concrete by gunny bag,plastic
| |||||
or tarpuli,finishig the formed surface
| |||||
with cement mortar1:3 of sufficent min.
| |||||
thickness to give a smooth and even
| |||||
surface or roughening if special finish is
| |||||
to be provided & curing etc. completed.
|
5.2
|
6500
|
Cu.m.
|
33800
| |
10
|
Filling in plinth & floor with contractors
| ||||
materials approved by Engg. in-charge in
| |||||
15 cm. To 20 cm.layers including watering
|
67.89
|
125
|
Cu.m.
|
8486.25
| |
& compaction etc. completed.
| |||||
11
|
RUBBLE STONE SOLING :-
| ||||
Providing dry trap / granite / quartzite /
| |||||
gneiss rubble stone solling15cm To 20cm
| |||||
thick including hand packing & comp. 4.98 150.00 Cu.m. 747.00
|
41.8
|
127
|
Cu.m.
|
5308.6
| |
etc. completed.
| |||||
12
|
BRICK MASONARY IN FOUNDATION
| ||||
& PLINTH :-
| |||||
Pro. brick masonaryin cement mortar 1:6
| |||||
using second class burnt brick in foundati
| |||||
on & plinth of inner walls / in plinth of ext.
| |||||
wall includinghttp://www.rampagare.blogspot.com bailing out water manually
| |||||
stricking joint on unexposed faces, rack--
| |||||
ing out joints on explosed faces & water-
|
12.5
|
4500
|
Cu.m.
|
56250
| |
ing completed.
| |||||
ABSTRACT SHEET
| |||||
13
|
BRICK WORK IN SUPER- STRUCTURE
| ||||
Pro. brick masonaryin cement mortar 1:6
| |||||
using second class burnt brick in super-
| |||||
structure including stricking racking joint
|
34.5
|
4500
|
Cu.m.
|
155250
| |
watering & scaffolding complete.
| |||||
14
|
DOORS & WINDOWS :-
| ||||
Pro. & fixing single leap pannled door c.c.
| |||||
t.w. 60mm x 100mm frame with out venti-
| |||||
lator shutter 35 mm thk. as per detailed
| |||||
drawing consisting c.c.t.w. vertical styles
| |||||
& for rail 95 mm x 35 mm lock & bottom
| |||||
rail 195 x 35 mm & panneled with 12mm
| |||||
thk. partical board including iron oxdi-
| |||||
sed fixture & faseining t.w.at junction
| |||||
of panelles inserted including 3 coat
|
14.89
|
1500
|
Sq.m.
|
22335
| |
of oil paint comp.
| |||||
15
|
FLOORING :-
| ||||
Pro. & laying flooring of kota flooring
| |||||
of size 25cm x 25 cm on a bed of
| |||||
(1 : 1 1/2 ) lime mortar / 1:6 cement
| |||||
mortar including neat cement float ,
| |||||
filling joints with neat cement slurry,cur
| |||||
ing & polishing & cleaing without border
| |||||
/ with border / with pattern cement tiles
|
530
|
40
|
Sq.m.
|
21200
| |
of grey colour.
| |||||
16
|
DADO :-
| ||||
pro. & fixing in req. position skirting of
| |||||
plain cement tile on plaster of 1 : 4
| |||||
including filling joints ,curing,polishing
|
21.8
|
245
|
Sq.m.
|
5341
| |
cleaning completed.
| |||||
17
|
PLASTER TO CELLLING
| ||||
Providing internal cement plaster of
| |||||
6 mm thk. in cement mortar 1 : 4 with-
| |||||
out neeru finish to concrete surface in
| |||||
all position incl. pro.scaffolding,providin.
| |||||
groov at joint of brick masonary & conc.
|
0
|
27
|
Sq.m.
|
0
| |
member . curing etc. complet.
| |||||
18
|
INTERNAL PLASTER :-
| ||||
Pro. internal cement plaster 12 mm thk.
| |||||
in single coat in cement mortar 1:4 with-
| |||||
out neeru finish to brick surface in
|
56.9
|
48
|
Sq.m.
|
2731.2
| |
all position incl. scaffolding curing.comp.
| |||||
19
|
NEERU FINISH :-
| ||||
Pro. neeru finish to plastered surface in
| |||||
all position except celling incl. scaffol--
|
56.9
|
11
|
Sq.m.
|
625.9
| |
ding curing.comp.
| |||||
20
|
EXTERNAL PLASTER TO WALL :-
| ||||
Pro. rough cast cement plaster extrnally
| |||||
in 2 coats to concrete,brick surface in
| |||||
all position with base coat 12 mm to --
| |||||
15 mm thk. in CM mortor 1:4 & rough
| |||||
cast treatment 12 mm thk. in propotion
|
23.89
|
89
|
Sq.m.
|
2126.21
| |
1:11/2 : 3 incl. scaffolding curing.comp.
| |||||
ABSTRACT SHEET
| |||||
21
|
PRIMER :-
| ||||
Pro. & applying primer coat for internal
|
46.9
|
9
|
Sq.m.
|
422.1
| |
wall surface & celling incl. scaffolding
| |||||
etc. comp.
| |||||
22
|
INT.PAINTING :-
| ||||
Pro. & applying washable distemper
| |||||
of approved colour & shade to
| |||||
new surface in 2 coats incl. scaffolding
|
256.09
|
15
|
Sq.m.
|
3841.35
| |
preparing surface etc.(incl. primer coat)
| |||||
23
|
EXTERNAL PAINTING :-
| ||||
Providing & applying 2 coats of water
| |||||
proof cement paint of approved mfg.
| |||||
& of approved colour to surface incl.
| |||||
scaffolding if necessary excluding primer
| |||||
coat cleaning & preparing the surface
|
189.09
|
23
|
Sq.m.
|
4349.07
| |
watering for 2 days etc. complete.
| |||||
25
|
GRILL WORK :-
| ||||
Pro. & fixing mild steel grill ,channel gate
| |||||
dwoors, windows,ventilators etc. as per
| |||||
detail drawing including fixt., neccesary
| |||||
welding & painting with 1coat of anti
| |||||
coorasive paint & 2 coats of oil paint
|
L/S
|
50,000
| |||
etc. comp.
| |||||
27
|
Providing & fixing in position on mild steel
| ||||
Hysd bar for R.C.C. footing,slabs beam
| |||||
column,chhajja,lintel,pardeis,arches etc.
| |||||
as per detailed drawing & schedules
| |||||
including cutting,bending,hooking the
|
25.8
|
6500
|
qt.
|
167700
| |
required complete.
| |||||
0
| |||||
Total estimated cost :-
|
903,561
| ||||
In wards :-NINE LAC THREE THOUSAND FIVE HUNDRED &SIXTY ONE ONLY.
|